Tim Beattie
2018-04-29 a5a0b4625f24965ecea7463ef9671f5916aebee5
commit | author | age
949294 1 # Setting up the Enablement Session
TB 2
2528a0 3 > These notes are intended to evolve into a set of shared thoughts on how to set up and facilitate the Open Innovation Labs DevOps Culture and Practice Enablement.
949294 4
TB 5 _____
6
7
8 ## Booking the space and facilities
9
10 Key requirements for the venue include:
11
12 * Desks in workshop format (5 tables of 4-5 people), ideally on wheels and movable (so we can go through the experience of teams configuring the space)
13 * Power socket banks for each table 
14 * LOTS of wall space (more than you could think.... we may need to supplement with "portable wall" boards) 
15 * Projector that supports HDMI
16 * Ability to play sound from laptop
943e9f 17 * Strong WiFi (all delegates will need to be connected throughout the Enablement)
949294 18 * At least one break out area - ideally a small room near the main room
TB 19
20
21 ## Shopping / Bring List
22
23 * Print Exercise Booklets - a PDF of all exercises. We have printed these in A4 color, double-sided with wire binding, a clear cover and black card back
24 * Card printouts of "The Big Picture" components
25 * Poster printouts of
26     * Henrik Kniberg Product Ownership in a Nutshell
27     * Henrik Kniberg Skateboard Picture
28     * The Agile Manifesto Values and Principles
29     * What DevOps is Not
2528a0 30 * Some spare adapters for overseas' participants to connect laptops to power    
949294 31 * Bluetac
TB 32 * A1 Sticky Chart Paper
33 * Boards (especially if wall space is lacking)
34 * Post-it / sticky notes (variety of colors and sizes as described in the Facilitation Guides)
35 * Sharpies (enough for one per participant + a few extra)
36 * Whiteboard Pens - mixture of colors
37 * Magic Whiteboard (especially if there is a lack of whiteboard space in the venue)
38 * Painters' Tape - mixture of colors
39 * Bluetooth Speaker
40 * Fun activities (e.g. a mini golf set and mini ping pong set)
41 * Option to project build monitors (e.g. through Rasperry Pis) - organise extra monitors or bring projector
42 * Think about capturing the Enablement by bringing, for example, GoPro Camera, 360 cameera, etc.
43
44
45 ## Setting up the Room
46
47 The day before the Enablement begins, get access to the room and lay out all materials. Specific things to set up include:
48 * Backlog
49 * Burndown
50 * Definition of Done
51 * Target Outcomes
52 * Realtime Retrospective
53 * Big Picture Area
54 * Practice Corner Area
55 * Ping Pong and Golf
56 * Labs is….
57 * Space for Faces
58 * Space for Animals
59
60 Think about the wall space that will be used for:
61 * Team's Social Contract
62 * Wider Group Social Contract
63 * Event Storming
64 * Metric Based Process Maps
65 * Value Slicing
66 * End of Day Retros
67
68
69 ## Facilitation Guidelines
70
71 * Facilitation Guides have been prepared for each of the exercises (technical and non-technical). These are intended to be living and breathing documents which will be updated as more Enablement sessions are run.
72 * Slideware includes lots of real world residency examples of practices being taught. It is expected that these examples will change session-by-session and the Labs facilitators will inject their own stories, photos and videos in here.
a5a0b4 73 * Catering is an important factor to consider. Having group breakfasts and lunch emulates what we do on Residencies
TB 74 * Having a group social during the week is also an important aspect of the Enablement